Thanh Thang Cement Plant Project

PPL is responsible for receiving, transporting, and delivering equipment and machinery for the construction of the Thanh Thang Cement Plant through a combined sea, river, and road transport chain.

du-an-thanh-thang

Goals & Scope of Work

  • Goods received at Hai Phong port.
  • Transported by barge to Ha Nam river port.
  • Transported by road from the river port to the construction site.
  • Completed handling of 5 shipments with a total volume of 30,000 ft.

Key Challenges

  • Large volume of cargo, many bulky pieces of equipment.
  • Multimodal coordination (sea – river – land) requires tight schedule control.
  • High safety standards are required when loading, unloading, and moving heavy equipment.

Solutions & Deployment

  • Arrange for specialized, high-capacity barges for the river route.
  • Use a suitable fleet of trucks and trailers to transport equipment to the construction site.
  • Organize and manage operations on a shipment-by-shipment basis to ensure progress and safety.
  • Coordinate closely with the port and the investor throughout the process.

Project Overview

Product Type

Industrial machinery and equipment

Quantity

30,000 FT

Shipment Number

5 shipments

Results & Effectiveness

  • Completed the transportation of 5 full-package shipments on time.
  • Ensured absolute safety for equipment and vehicles.
  • Contributed to the construction progress of Thanh Thang Cement Plant.

Notice