Tan Son Nhat Terminal T3 Project
Tan Son Nhat Terminal T3 Project is a national key project invested by Vietnam Airports Corporation (ACV), starting construction at the end of 2022 with a total investment of nearly 11,000 billion VND.
Goals & Scope of Work
ATAD - Vietnam's leading steel structure contractor, was awarded a steel structure contract by Construction Corporation No. 1, responsible for designing, manufacturing and assembling the entire steel structure system for this iconic project. In addition, ATAD is also a member of the Vietur consortium that won the bid for the construction and installation of equipment for the Long Thanh International Airport passenger terminal.
With high expertise in the field of oversized and overweight transportation, PPL is proud to be the partner chosen by ATAD to transport more than 3,156 tons of steel structures from ATAD factories in Long An and Dong Nai to the construction site, contributing to the construction of a national key project.
Project information:
- More than 1,650 tons of steel were transported from ATAD Long An factory.
- More than 1,505 tons of steel were transported from ATAD Dong Nai factory.
- The steel structures are ~24m long and ~5m wide.
Estimated shipping time from 05/2024 to 09/2024.