Complete loadout module 01 at PV shipyard (Phase 2)
11.04.2022
Update the progress of implementation of Kanfa module loadout project phase 2 at PV Shipyard port.
On April 9, 2022, PPL completed the following works:
- Conduct toolbox, unify all work items, things to note before performing loadout.
- Complete Site Moving and Loadout Module 01.


- Unload the trailer from the barge and proceed to receive Module 02.
- Complete Lift test module 02.
- Complete the Pre Ballast and arrange the pump in the required position to serve Loadout Module 02.