Start moving module 04 at PV Shipyard

14.03.2022
Last March 9, 2022, after completing the toolbox, testing module 04 and making sure there were no problems, PPL experts and engineers moved the module 04 to the loadout position.

To move module 04 from the wharf to the barge, PPL engineers used a self-propelled hydraulic trailer (SPMT) and the process was smooth.

start-moving-module-04-2Move module 04

The implementation process requires meticulousness and absolute precision in controlling the device. PPL engineers and staff always follow every moving process to be able to ensure the highest safety for the module.