Tan Son Nhat Terminal T3 Project

Tan Son Nhat Terminal T3 Project is a national key project invested by Vietnam Airports Corporation (ACV), starting construction at the end of 2022 with a total investment of nearly 11,000 billion VND.

z5393757199748-4cc661b76714c6895fd0ce8675980896-1

Goals & Scope of Work

  • Safe and timely transportation of all steel structures for the construction of Terminal 3.
  • Ensuring traffic safety and technical standards are met during the transportation of oversized and overweight cargo.
  • Closely coordinating with ATAD and the construction contractor at the site.

Key Challenges

  1. Large volume of material to be transported (3,156 tons) in a short time.
  2. Large steel structure (~24 m long, ~5 m wide).
  3. Transportation route through a high-traffic area.
  4. Strict adherence to national project safety regulations and progress control requirements.

Solutions & Deployment

  • Mobilize a fleet of specialized, internationally standardized oversized and overweight vehicles.
  • Develop optimal transportation plans for each route to minimize risks.
  • Coordinate personnel in shifts to ensure safe traffic flow in densely populated areas.
  • Monitor 24/7 to control the progress and quality of transportation.

Project Overview

Investor

Vietnam Airports Corporation (ACV)

Steel Structure Contractor

ATAD

Transport Volume

1,650+ tons from ATAD Long An1,505+ tons from ATAD Dong Nai

Structure Dimensions

Length ~24 m, Width ~5 m

Transport Time

May 2024 - September 2024

Results & Effectiveness

  • The entire steel structure was transported safely and on schedule, without any incidents.
  • All technical requirements and deadlines of the contractor ATAD were met.
  • This contributed to accelerating the construction progress of a key national project – Tan Son Nhat Terminal 3.