PPL experts prepare Load in & Load out project items at Dong Xuyen port and Shipyard port

24.12.2021

Dong Xuyen port and Shipyard port are seaports located near the gateway to international maritime routes and in the heart of the oil and gas industry service area of ​​Ba Ria Vung Tau province, which are being prepared by PPL experts. Load in & Load out modules.
In this Load in & Load out project, PPL experts use a self-propelled hydraulic trailer system (SPMT) to bring the equipment from the wharf to the barge and from the barge to the wharf.
 

z3047461281224_3a34b47a45fb01653efd7a1630ef715a
Photo: Preparing to board the barge


To carry out these tasks, experts and staff of PPL need to meet and calculate very carefully, make detailed work plans, and coordinate with employees of Dong Xuyen Port and Shipyard Port.
 

 

 z3047461276152_1b093ea63f893f2693d27198bb6aa342
Photo: Lashing on the trailer

 
With super-sized blocks of goods, they need to be transported very carefully, especially in the preparation stage. The more you prepare, the more effective, faster and more accurate the plan will be when implemented.

PPL will continue to update the work in the Load in & Load out process in the following news articles.

Notice