Move modules to Shipyard port
29.12.2021
After moving from Dong Xuyen port, the modules were transported by barges to Shiptard port
The move of modules from Dong Xuyen port to Shipyard port was docked on December 28, the team of experts had a toolbox meeting to prepare to deploy for loading in modules at the port.
Photo: Tool box before loading in port
Loading in modules also requires experience as well as techniques like loading out at Dong Xuyen port, so experts need to do it very carefully and meticulously every detail.

Photo: A module has been loaded into the temporary yard of Shipyard port